Investigate existing site conditions, interfaces and responsibilities
Preliminary negotiations on approvability
The requirements developed in the definition phase can be used to take design choices. During the design phase, one or more projects are developed, and the final project can apparently be achieved.
We are architects registered with the Chamber of Architecture in Berlin under number 16175.Because we work all over Germany, we have a well-known network of professional consultants, such as fire safety engineers and structural engineers
We can provide details if required and shop drawings to the chosen General Contractor.
Interface/coordinate with the Client regarding specific requirements for bidding/tendering of documents.
Receiving the tender and create a price comparison list
Controlling of the detailed fit-out schedule.
Finalizing the Town Hall process including updating the permit drawings in case of difformity due construction changes.Coordination with the GC for all documentation required to trade